Flat/Cyl/Eqpt Costs

Project Number
Flatwork (Boiler, Hopper, Duct) Insulation Costs
Calcium Silicate
Thick$/SF
Single Layer
Double Layer
Mineral Wool
Thick$/SF
Fiberglass
Thick$/SF
Flatwork (Boiler, Hopper, Duct) Cyl (Vessel, Duct) Eqpt Metal Jacketing Costs $/sf
Aluminum
Flat Box/Corr
See Piping .024
See Piping .032
.040
.050
Galvanized
Flat Box/Corr
20Ga
24Ga
28Ga
Cylindrical (Duct, Vessel) Metal Band Costs $/lb
Stainless
1 x .015
Stainless
1 x .020
Galvanized
1 x .020
Miscellaneous Costs
Weld Pins EA
J-Hooks EA
4x4 Road Mesh SF
6x6 Road Mesh SF
Hex Mesh SF
1" Cement SF
A-Cloth SF
Glass Fab SF
Standoffs EA
Girts LF