Bid Compiled:
JOBSITE CONDITIONS |
Project Number | Bid Compiled | Project Name | Start Date |
---|---|---|---|
Project Type | Finish Date | ||
Heat | Supervision (0-9) | ||
Cold | Local Labor (0-9) | ||
Precipitation | Avg Wage | 0.00 | |
Overtime |
DISCOUNTS |
Piping Insulation Discount Percent | |
---|---|
Jacket Discount Percent |
PIPING COSTS/SPECS |
************ Insulation *********** | | | ***** Jacket ***** | | | ****** Bands ****** | |||||||
Type | Size | Thick | Layer | $/LF | | | Type | Thick | $/SF | | | Type | $/LB |
---|---|---|---|---|---|---|---|---|---|---|---|
Calcium Silicate | 0.00 | | | Aluminum | 016 | 0.00 | | | Stainless 1/2 x .015 | 0.00 | |||
Mineral Wool | 0.00 | | | 020 | 0.00 | | | Stainless 3/4 x .015 | 0.00 | ||||
Fiberglass | 0.00 | | | 024 | 0.00 | | | Stainless 1 x .015 | 0.00 | ||||
Custom Material prices in DB tables | 032 | 0.00 | | | Stainless 1/2 x .020 | 0.00 | ||||||
Stainless | 010 | 0.00 | | | Stainless 3/4 x .020 | 0.00 | ||||||
****** Prefabricated Ells ****** | 016 | 0.00 | | | Stainless 1 x 020 | 0.00 | ||||||
45/90 | Size | Thick | $/EA | 019 | 0.00 | | | Galvanized 1/2 x .020 | 0.00 | |||
0.00 | Steel | 010 | 0.00 | | | Galvanized 3/4 x .020 | 0.00 | |||||
016 | 0.00 | | | Galvanized 1 x .020 | 0.00 | |||||||
Canvas | 0.00 | ||||||||||
PVC Prices in DB Tables |
BOILER/HOPPER/DUCT/EQPT COSTS/SPECS |
************ Insulation *********** | | | *********** Sheet Metal *********** | |||||||
Single Layer | Double Layer | | | Type | Flat $/SF | Thick | Box/Corr $/SF | |||
---|---|---|---|---|---|---|---|---|---|
Type | Thick | $/SF | Thick | $/SF | | | Aluminum | See Piping | 024 | 0.00 |
Calcium Silicate | 0.00 | 0.00 | | | See Piping | 032 | 0.00 | |||
Mineral Wool | 0.00 | 0.00 | | | 0.00 | 040 | 0.00 | |||
Fiberglass | 0.00 | 0.00 | | | 0.00 | 050 | 0.00 | |||
Galvanized | 0.00 | 20Ga | 0.00 | ||||||
0.00 | 24Ga | 0.00 | |||||||
0.00 | 28Ga | 0.00 |
MISC COSTS | |||||
Weld Pins $/EA | 0.00 | | Hex Mesh $/SF | 0.00 | | A-Cloth $/SF | 0.00 |
---|---|---|---|---|---|
J-Hooks $/EA | 0.00 | | 1′ Cement $/SF | 0.00 | | Standoffs $/EA | 0.00 |
4×4 Road Mesh $/SF | 0.00 | | Glass Fab/Mastic $/SF | 0.00 | | Girts $/EA | 0.00 |
6×6 Road Mesh $/SF | 0.00 |