Project Form Click HERE to return to PROJECT CONTROL Project Number test2 Hayden Station Project Name Owner Location RFQ # Start Date Finish Date Jobsite Conditions Project Type – Enter Project Type – Fossil Fuel Power Plant Cogen Power Plant Nuclear Power Plant Refinery Chemical Heavy Industrial Turbine Commercial Other Cold – Cold – Rarely Cold Occasionally Cold Extremely Cold Heat – Heat – Rarely Hot Occasionally Hot Extremely Hot Precipitation – Precipitation – Arid Climate Occasionally Rainy/Snowy Extremely Rainy/Snowy Supervision – Quality of Supervision – Poor Supervision 2 of 10 Below Avg Supervision 4 of 10 Average Super 6 of 10 7 of 10 Above Avg Supervision 9 of 10 Excellent Supervision Labor – Quality of Labor – Poor Labor 2 of 10 Below Avg Labor 4 of 10 Average Labor 6 of 10 7 of 10 Above Avg Labor 9 of 10 Excellent Labor Wage Overtime: – Overtime Rate – Time-and-a-Half Double Overtime Vendor Discount Rates Piping Discount % Jacket Discount % Table Piping Insulation Costs $/LF Calcium Silicate Size Thick Layer – Cal-Sil Layer – Single Layer Double Layer No Insulation Cost Mineral Wool Size Thick Layer – Min Wool Layer – Single Layer Double Layer No Insulation Cost Fiberglass Size Thick Layer – Fiberglass Layer – Single Layer Double Layer No Insulation Cost Table Pipe Jacket Costs $/SF Aluminum .016 .020 .024 .032 Stainless Steel .010 .016 .019 Steel .010 .016 Canvas Piping Metal Band Cost $/LB Stainless 1/2 x .015 3/4 x .015 Stainless 1/2 x .020 3/4 x .020 Galvanized 1/2 x .020 3/4 x .020 Table Prefab Jacket Elbows $/EA 45/90 – Enter Sample Ell Type – 90-Degree Ells 45-Degree Ells Size Thick Cost Measure Method (required) Weld-to-Weld Centerline Additional Line Items Shipping Travel Compenasation Travel Vehicles