Pipe Form

Project Number: 1999 UPDATE Piping

LINE IDENTIFIERS
Bid Item PlantEqpt
System/Line LPHeaters
Size Thick
TAKEOFF QUANTITIES
Straight LFBends LF90 Ells
45 EllsFittingsFlangesValves
Tee’sCapsP-TrapsP-line LF
COVERAGE SPECIFICATIONS
Insulation
Layer
Jacket
Thick
Bands Over Insulation
Band Space Inches
Bands Over Jacket
Band Space Inches
COST OVERRIDES
Insulation
$ LF Str Flange Pair Flanged Valve
Jacket Elbows
90 45
Production
LF/Day
UNIT PRICES
`
$/LF Straight $/90 Elbow $/45 Elbow
140.19 1409.07 1150.17
`
$/Fitting $/Flange $/Flanged Valve
392.04 1162.01 3438.34