Pipe Form

Project Number: 1999 UPDATE Piping

LINE IDENTIFIERS
Bid Item PlantPiping
System/Line ExtractSteam
Size Thick
TAKEOFF QUANTITIES
Straight LFBends LF90 Ells
45 EllsFittingsFlangesValves
Tee’sCapsP-TrapsP-line LF
COVERAGE SPECIFICATIONS
Insulation
Layer
Jacket
Thick
Bands Over Insulation
Band Space Inches
Bands Over Jacket
Band Space Inches
COST OVERRIDES
Insulation
$ LF Str Flange Pair Flanged Valve
Jacket Elbows
90 45
Production
LF/Day
UNIT PRICES
`
$/LF Straight $/90 Elbow $/45 Elbow
61.08 282.98 243.17
`
$/Fitting $/Flange $/Flanged Valve
83.56 259.83 765.50