Flatwork – Cylindrical – Equipment Costs

Project Number 1999 Mesa Generating Plant
Flatwork (Boiler, Hopper, Duct) Insulation Costs
Calcium Silicate
Thick$/SF
Single Layer
Double Layer
Mineral Wool
Thick$/SF
Single Layer
Double Layer
Fiberglass
Thick$/SF
Single Layer
Double Layer
Metal Jacketing Costs $/SF
Aluminum
Flat Box/Corr
See Piping .024
See Piping .032
.040
.050
Galvanized
Flat Box/Corr
20Ga
24Ga
28Ga
     
Cylindrical (Duct, Vessel) Metal Band Costs $/lb
Stainless
1 x .015
Stainless
1 x .020
Galvanized
1 x .020
Miscellaneous Costs
Weld Pins EA
J-Hooks EA
4×4 Road Mesh SF
6×6 Road Mesh SF
Hex Mesh SF
1″ Cement SF
A-Cloth SF
Glass Fab SF
Standoffs EA
Girts LF